USM - Central Heating Plant Boiler Replacement

 
 

ECS was the mechanical contractor on this project which completely replaced all major equipment in the Central Heating Plant for the campus.  Scope of work included removal of three Cleaver Brooks boilers and installation of two 500 hp Hurst, dual fuel hot water boilers, and one 150 hp dual fuel hot water boiler to provide heating water for the entire Gorham campus.  ECS removed and installed all new piping and equipment for the following systems:


High-Pressure Hot Water

Feedwater, including new Grundfos triplex forwarding pump set

Fuel Oil, including new Albany duplex pump set

Natural Gas

Propane

General Plumbing

Chemical Feed

Compressed Air, including new CAS duplex air compressor


Three new supply air fans and two exhaust fans were installed.  Heating coils were installed at the supply fans with a new glycol loop consisting of a hot water heat exchanger, and two Grundfos vertical multistage pumps. 

 

Boiler Replacement Project